Sadbhav Engineering awards construction contract to KNR Constructions for Rehabilitation and up gradation to two lane with paved shoulders and maintenance of (i) Chhhindwara – Linga – Umarnala – Saoner Section of NH-26B (from Ch. 1.000 Km to 87.00 Km – Length 86 Km) including Part of Chhindwara by pass (Km 23.553 to Km. 9.275 – length – 5.722 Km), and (ii) Multai (Km. 244.425) upto near Imlikhera (Km 167.700) – Length 76.725 Km” in the State of Madhya Pradesh and Maharashtra The contract is valued at Rs.5801.million. The work is to be completed in 36 months