KNR Constructions Bags Construction Contract from Sadbhav Engineering

Sadbhav Engineering awards construction contract to KNR Constructions for Rehabilitation and up gradation to two lane with paved shoulders and maintenance of (i) Chhhindwara – Linga – Umarnala – Saoner Section of NH-26B (from Ch. 1.000 Km to 87.00 Km – Length 86 Km) including Part of Chhindwara by pass (Km 23.553 to Km. 9.275 – length – 5.722 Km), and (ii) Multai (Km. 244.425) upto near Imlikhera (Km 167.700) – Length 76.725 Km” in the State of Madhya Pradesh and Maharashtra The contract is valued at Rs.5801.million. The work is to be completed in 36 months